WBV Risk Reduction


projectMap





Project Location

N/A

Project Description

This study seeks to determine if it the work necessary to sustain the 1% level of risk reduction for the WBV system is technically feasible, environmentally acceptable, and economically justified.

Issue Addressed

Levee compaction and subsidence no longer being able to provide flood protection at the 1% level.

Project Goals

N/A

Verify Date

1/15/2020
Search for More Documents
  • No documents to display
  • No documents to display
  • No documents to display
  • No documents to display

Project Information

Project Type(s):

Hurricane Protection

Project ID:

BA-0212

Basin(s):

Barataria

CPRA Program:

Hurricane and Storm Damage Risk Reduction System (HSDRRS)

Federal Sponsor:

United States Army Corps of Engineers (USACE)

CPRA Project Phase:

Planning

Parish(es):

Jefferson, St Charles

Estimated Cost:

$ 3 million